Application for an environmental permit, Part B11: standard rules permit for flood risk activities (EPB11)

Original title : Application for an environmental permit Part B11 – Flood Risk Activity standard rules application

Agency
Environment Agency
Country
United Kingdom
Form language
English
Version
EPB11 v3 (07/2024)
Pages
5
Fields
28

Download the fillable PDF · Fill in here

At a glance

Part B11 (EPB11, version 3 of July 2024) of the Environment Agency's environmental permit application: it is used to apply for a standard rules permit for flood risk activities, that is, activities in, under and over a main river, and other activities that could affect flooding from a main river or the sea. Five pages.

Purpose and who should fill it in

  • According to the introductory text, part B11 is completed together with parts A and/or F3 when you are applying for a new standard rules permit. You are asked to read the form and the guidance notes that come with it; completing it takes less than 1 hour.
  • Section 1 asks for details of any discussions with the Environment Agency before the application. Section 2 locates the activities: Ordnance Survey National Grid Reference, upstream and downstream references for a stretch of watercourse, the name of the watercourse, and whether a site plan is included.
  • Section 3 asks you to tick the sets of standard rules applied for: from SR2015 No.26 to No.38 (temporary dewatering, outfall, clear span bridge, temporary storage or diversion, habitat structure, access culvert, bank repair, scaffolding, pond, boreholes and trial pits, gravel removal) and SR2019 No.1 to No.3 (mooring pile, steps and ramps, water gates). The text asks you to read the standard rules before applying.
  • It also asks whether a screening report is included, and the start and completion dates of the activities, with an indication of frequency for repeated activities. If no report is included, the agency screens the proposal on receipt.
  • Section 4 lists the supporting plans and documents, section 5 asks whether the management system meets the conditions in the guidance (compliance will become a condition of the permit), and section 6 gives contacts.

Step by step

  1. Read the form and the guidance notes, then complete this part together with parts A and/or F3 for a new standard rules permit.
  2. Section 1: give details of any discussions with the Environment Agency before the application.
  3. Section 2: state in detail where the activities will take place, with the National Grid Reference; for a stretch of watercourse, the upstream and downstream references; give the name of the watercourse and whether a site plan is included.
  4. Section 3a: tick the sets of standard rules concerned, after reading the rules.
  5. Section 3b: say whether you are including a screening report.
  6. Section 3c: give the start and completion dates of the activities, and for repeated activities an indication of how often they take place.
  7. Section 4: list the plans and documents enclosed. Section 5: say whether your management system meets the conditions in the guidance.
  8. For help, use the contacts in section 6 on the last page.

What the form contains

The PDF has 5 pages. Its entry fields are grouped under 5 headings taken from the document:

  • 1 About the permit — 1 field: Discussions before your application
  • 2 About the site — 6 fields: Where the activities will take place ; Site National Grid Reference ; Upstream NGR ; Downstream NGR
  • 3 About this application — 19 fields: SR2015 No.26: Temporary dewatering (up to 20 m) ; SR2015 No.27: Outfall into main river ; SR2015 No.28: Clear span bridge ; SR2015 No.29: Temporary storage in flood plain
  • 4 Supporting plans and documents — 1 field: Plans and documents list
  • 5 Management systems — 1 field: Management system meets conditions

Filling it in with MaxyForms

This PDF has 28 native entry fields: MaxyForms opens it in your browser, you type your answers into the document, then save or print it.

  • Entry areas found, by type: 4 text fields, 4 long-text areas, 2 dates, 15 checkboxes and 3 single choices.
  • Dates: the editor expects the format DD/MM/YYYY.
  • 2d Site plan included: one choice among Yes / No.
  • 3b Screening report included: one choice among Yes / No.
  • Management system meets conditions: one choice among Yes / No.

Frequently asked questions

What does a flood risk activity permit cover?
The form speaks of "Flood Risk Activities": activities in, under and over a main river and other activities that could affect flooding from a main river or the sea.
What is the screening report?
It confirms that the location of your proposal complies with the standard rules. If it is not included, the agency screens the proposal on receipt and advises whether the application is valid at this location.
What is a management system?
It describes how you undertake your activities and the measures you put in place to manage flood risk and risks to drainage and the environment; compliance will become a condition of any permit.
Can the PDF be filled in on screen?
Yes: this PDF contains 31 native fields, you can fill it in your browser with MaxyForms before saving or printing it.
Which edition of this form is offered here?
This page describes edition “EPB11 v3 (07/2024)”.

What the form does not say

The PDF gives no place of filing, no time limit and no fee. For help, it gives the Environment Agency general enquiries line on 03708 506 506. See the source page given in this sheet. This page is general information, not legal advice.

Related forms

Same procedure

Same issuing body: Environment Agency

Same topic: Agriculture and environment

Topics

Official source

www.gov.uk

Licence
Open Government Licence v3.0 (United Kingdom)
Required attribution
Contains public sector information licensed under the Open Government Licence v3.0. Source: Environment Agency (GOV.UK).
Scope of the licence
Licence read on the source site (GOV.UK).
Exclusions
Logos, coats of arms and third-party rights are excluded.

Unofficial site. This copy is reproduced under the licence below. Always check the issuing body's website for the latest version.

Report a problem or request removal