Application for an environmental permit, Part B11: standard rules permit for flood risk activities (EPB11)
Teitl gwreiddiol : Application for an environmental permit Part B11 – Flood Risk Activity standard rules application
- Asiantaeth
- Environment Agency
- Gwlad
- Y Deyrnas Unedig
- Iaith y ffurflen
- Saesneg
- Fersiwn
- EPB11 v3 (07/2024)
- Tudalennau
- 5
- Meysydd
- 28
Lawrlwytho'r PDF y gellir ei lenwi · Llenwi yma
Ysgrifennwyd y canllaw manwl yn Ffrangeg ac yn Saesneg. Fe'i dangosir yma yn Saesneg.
At a glance
Part B11 (EPB11, version 3 of July 2024) of the Environment Agency's environmental permit application: it is used to apply for a standard rules permit for flood risk activities, that is, activities in, under and over a main river, and other activities that could affect flooding from a main river or the sea. Five pages.
Purpose and who should fill it in
- According to the introductory text, part B11 is completed together with parts A and/or F3 when you are applying for a new standard rules permit. You are asked to read the form and the guidance notes that come with it; completing it takes less than 1 hour.
- Section 1 asks for details of any discussions with the Environment Agency before the application. Section 2 locates the activities: Ordnance Survey National Grid Reference, upstream and downstream references for a stretch of watercourse, the name of the watercourse, and whether a site plan is included.
- Section 3 asks you to tick the sets of standard rules applied for: from SR2015 No.26 to No.38 (temporary dewatering, outfall, clear span bridge, temporary storage or diversion, habitat structure, access culvert, bank repair, scaffolding, pond, boreholes and trial pits, gravel removal) and SR2019 No.1 to No.3 (mooring pile, steps and ramps, water gates). The text asks you to read the standard rules before applying.
- It also asks whether a screening report is included, and the start and completion dates of the activities, with an indication of frequency for repeated activities. If no report is included, the agency screens the proposal on receipt.
- Section 4 lists the supporting plans and documents, section 5 asks whether the management system meets the conditions in the guidance (compliance will become a condition of the permit), and section 6 gives contacts.
Step by step
- Read the form and the guidance notes, then complete this part together with parts A and/or F3 for a new standard rules permit.
- Section 1: give details of any discussions with the Environment Agency before the application.
- Section 2: state in detail where the activities will take place, with the National Grid Reference; for a stretch of watercourse, the upstream and downstream references; give the name of the watercourse and whether a site plan is included.
- Section 3a: tick the sets of standard rules concerned, after reading the rules.
- Section 3b: say whether you are including a screening report.
- Section 3c: give the start and completion dates of the activities, and for repeated activities an indication of how often they take place.
- Section 4: list the plans and documents enclosed. Section 5: say whether your management system meets the conditions in the guidance.
- For help, use the contacts in section 6 on the last page.
What the form contains
The PDF has 5 pages. Its entry fields are grouped under 5 headings taken from the document:
- 1 About the permit — 1 field: Discussions before your application
- 2 About the site — 6 fields: Where the activities will take place ; Site National Grid Reference ; Upstream NGR ; Downstream NGR
- 3 About this application — 19 fields: SR2015 No.26: Temporary dewatering (up to 20 m) ; SR2015 No.27: Outfall into main river ; SR2015 No.28: Clear span bridge ; SR2015 No.29: Temporary storage in flood plain
- 4 Supporting plans and documents — 1 field: Plans and documents list
- 5 Management systems — 1 field: Management system meets conditions
Filling it in with MaxyForms
This PDF has 28 native entry fields: MaxyForms opens it in your browser, you type your answers into the document, then save or print it.
- Entry areas found, by type: 4 text fields, 4 long-text areas, 2 dates, 15 checkboxes and 3 single choices.
- Dates: the editor expects the format DD/MM/YYYY.
- 2d Site plan included: one choice among Yes / No.
- 3b Screening report included: one choice among Yes / No.
- Management system meets conditions: one choice among Yes / No.
Frequently asked questions
- What does a flood risk activity permit cover?
- The form speaks of "Flood Risk Activities": activities in, under and over a main river and other activities that could affect flooding from a main river or the sea.
- What is the screening report?
- It confirms that the location of your proposal complies with the standard rules. If it is not included, the agency screens the proposal on receipt and advises whether the application is valid at this location.
- What is a management system?
- It describes how you undertake your activities and the measures you put in place to manage flood risk and risks to drainage and the environment; compliance will become a condition of any permit.
- Can the PDF be filled in on screen?
- Yes: this PDF contains 31 native fields, you can fill it in your browser with MaxyForms before saving or printing it.
- Which edition of this form is offered here?
- This page describes edition “EPB11 v3 (07/2024)”.
What the form does not say
The PDF gives no place of filing, no time limit and no fee. For help, it gives the Environment Agency general enquiries line on 03708 506 506. See the source page given in this sheet. This page is general information, not legal advice.
Related forms
Same procedure
- Disability Living Allowance (DLA) for children claim form (DLA1 Child) A 40-page claim form from the Department for Work and Pensions (DWP, United Kingdom) for Disability Living Allowance (DLA) for a child under 16.
- Attendance Allowance claim form (AA1) for people of State Pension age or over Form AA1 of the Department for Work and Pensions (DWP): the claim for Attendance Allowance, a UK benefit for people of State Pension age or over who need help or supervision because of an illness or disability.
- Strike off a company from the register (DS01) - DS01 paper form (only use if you cannot apply online) Form DS01 of Companies House (United Kingdom), version 9.0 (02/26): the application by which a company's directors ask for it to be struck off the register, under section 1003 of the Companies Act 2006.
Same issuing body: Environment Agency
- Duty of care: waste transfer note (WMC2A)
- Form WR: Table of water needed for spray irrigation
- Water abstraction: application to revoke (cancel) a licence - Form WR4
- Form WR: Spray or trickle irrigation of crops – extra information
- RTA1 River Thames accommodation licence Application form
Same topic: Agriculture and environment
Ffynhonnell swyddogol
- Trwydded
- Open Government Licence v3.0 (United Kingdom)
- Priodoliad gofynnol
- Contains public sector information licensed under the Open Government Licence v3.0. Source: Environment Agency (GOV.UK).
- Cwmpas y drwydded
- Licence read on the source site (GOV.UK).
- Eithriadau
- Logos, coats of arms and third-party rights are excluded.
Gwefan answyddogol. Atgynhyrchir y copi hwn o dan y drwydded isod. Gwiriwch wefan y corff cyhoeddi bob amser am y fersiwn diweddaraf.