Social or very social rent agreement without works (Anah, form 12808*09)
Original title : Convention à loyer social ou très social, sans travaux (cerfa N° 12 808*09, Anah)
- Agency
- Agence nationale de l'habitat (Anah)
- Country
- France
- Form language
- French
- Version
- N° 12 808*09
- Pages
- 5
- Fields
- 52
Download the fillable PDF · Fill in here
At a glance
Standard agreement of the National Housing Agency (Anah) by which a landlord undertakes to let a dwelling at a social or very social rent, without a works grant, which gives entitlement to personalised housing aid (APL) and may give entitlement to an income tax reduction. Five pages: covering letter, then the agreement.
Purpose and who should fill it in
- Page 1 is a letter to the landlord: the maximum rent per m² is set by regulation at national level according to the level of market rents in the municipality, and the dwelling must be shown to meet a minimum energy performance level.
- The agreement is concluded between Anah and the landlord under articles L. 321-8 and D. 321-23 of the construction and housing code; it gives entitlement to APL.
- It identifies the parties and the dwelling (address, living area, annexes, so-called tax area, cadastral reference, social or very social nature), then the start date, duration and expiry, extension by amendment and exceptional termination by Anah.
- It sets the occupancy conditions (unfurnished letting to individuals, main residence occupied at least eight months a year), tenants' income ceilings, allocation from a list of candidates from the prefect for very social lettings, the lease, decency, the maximum rent and its annual revision.
- Finally it provides for monitoring and checks, penalties, the jurisdiction of the administrative court in case of dispute, and the tax provisions linked to the tax reduction provided for in article 199 tricies of the general tax code.
Documents to attach
- Proof of a minimum energy performance level for the dwelling.
Deadline
The agreement must be concluded before the lease is signed, or before its effective date or that of its renewal, or at the latest two months after; after that two-month period, signing is no longer possible.
Step by step
- Read the letter on page 1: rent level, energy performance, time for concluding the agreement.
- Give your telephone and e-mail contact details, which the form asks you to pass to Anah.
- Page 2: complete the parties (landlord's name or company name, address, legal representative) and the dwelling (precise address, living area, area of annexes, total tax area, cadastral reference, social or very social nature).
- Give the start date, the duration in years and the expiry date of the agreement.
- Page 4: enter the maximum rent per m² of tax area, the updated maximum rent if applicable and the monthly rent charged excluding service charges.
- Date and sign the agreement, the landlord opposite the Anah signature; the validation box on page 1 is reserved for Anah.
- If you claim the tax reduction, attach to your overall income tax return a copy of the agreement validated by Anah.
What the form contains
The PDF has 5 pages. Its entry fields are grouped under 10 headings taken from the document:
- Your contact details — 2 fields: Telephone number ; Email address
- Parties to the agreement — 4 fields: Agreement with Mr or the company ; Landlord or company name (continued) ; Anah delegate, département ; President of the departmental council or EPCI
- The landlord (individual) — 4 fields: Landlord's surname and first name ; Residing at ; Landlord's postcode ; Landlord's town
- The landlord (company) — 4 fields: Company name ; Registered office address ; Registered office postcode ; Registered office town
- Legal representative — 4 fields: Legal representative's name ; Legal representative's address ; Representative's postcode ; Representative's town
- The dwelling (I. purpose) — 10 fields: Dwelling address: number ; Street ; Dwelling postcode ; Dwelling town
- Floor areas — 6 fields: B. Living area: whole m² ; B. Living area: decimals ; C. Annexes area: whole m² ; C. Annexes area: decimals
- Start date and term (II) — 7 fields: Start date: day ; Start date: month ; Start date: year ; Term of the agreement (years)
- Rents (V) — 6 fields: Maximum rent per m²: euros ; Maximum rent per m²: cents ; Updated maximum rent: euros ; Updated maximum rent: cents
- Landlord's signature — 5 fields: Signed at (landlord) ; Signature date: day ; Signature date: month ; Signature date: year
Filling it in with MaxyForms
This PDF has 52 native entry fields: MaxyForms opens it in your browser, you type your answers into the document, then save or print it.
- Entry areas found, by type: 23 text fields, 27 boxed fields (one character per box), 1 drop-down list and 1 signature area.
- Telephone number: 10 printed boxes, one character in each.
- E. Cadastral reference: 8 printed boxes, one character in each.
- Landlord's postcode: 5 printed boxes, one character in each.
- 1 signature area: add your signature with the editor tool, or sign by hand on the printed copy.
- 8 fields can be prefilled from the profile stored on your device (nothing is sent to a server).
Frequently asked questions
- Within what time must the agreement be concluded?
- The letter says it must be concluded before the lease is signed, or before its effective date or that of its renewal, or at the latest two months after signature or the effective date; after that two-month period, signing is no longer possible.
- Can the dwelling be let to a relative?
- No: the agreement forbids letting to a member of the signatory's tax household, an ascendant or descendant, a partner of the signatory company or a relative of a partner, and a person already living in the dwelling, except at lease renewal.
- What happens if the dwelling is sold?
- The agreement binds the new owner by operation of law, its commitments must be mentioned in the transfer deed, and an amendment stating the identity of the new owner is signed with Anah.
- Can the PDF be filled in on screen?
- Yes: this PDF contains 63 native fields, you can fill it in your browser with MaxyForms before saving or printing it.
- Which edition of this form is offered here?
- This page describes edition “N° 12 808*09”.
What the form does not say
The PDF gives no specific place of filing and no fee: for information it refers to the local Anah delegation of the département and to anah.fr. This page is general information, not legal advice.
Related forms
Same procedure
- Declaration of the status of the buildings owned by the association (cerfa 13970*01) Cerfa 13970*01 allows an association to declare the initial status and the changes (acquisitions or disposals) of its real estate holdings.
- Anah model agreement, intermediate or social rental sector, farm lease with works subsidies (cerfa 15701*02) Standard agreement of the National Housing Agency (Anah) between the agency and a landlord whose dwelling is let under a farm lease and receives works subsidies.
- Electoral roll: applying to the judge in case of refusal of registration or removal by the mayor (cerfa 16038*01) Form cerfa 16038*01 of the ministry in charge of the interior: the application by which a voter challenges before the judge of the tribunal judiciaire (including the tribunaux de proximité) the mayor's decision to…
Same issuing body: Agence nationale de l'habitat (Anah)
- Mon Accompagnateur Rénov': certificate of undertaking to submit the annual activity report, natural person (Cerfa 17104*01)
- Mon Accompagnateur Rénov': certificate of undertaking to submit the annual activity report, legal entity (Cerfa 17103*01)
- Mon Accompagnateur Rénov': certificate of undertaking to follow the supplementary training plan, natural person (Cerfa 17106*01)
- Proposed methodology for household support (Mon Accompagnateur Rénov' approval), cerfa 17101*01
- Landlord: apply for an Anah agreement without works, intermediate rent (cerfa 12807*08)
Same topic: Housing
- Prior declaration for constructions and works not subject to a building permit
- Application for a planning certificate (cerfa 13410*13)
- Planning permission application for a single-family house and/or its outbuildings (PCMI)
- Tax on capital gains from sales of social housing: capital gain declaration for a sale for the year 2018 (form 15939*01)
Topics
- Housing and property (86)
- Renovation (24)
- Anah (France) (24)
Official source
- Licence
- Licence Ouverte 2.0 (etalab-2.0)
- Required attribution
- Source: Agence nationale de l'habitat (Anah), via service-public.gouv.fr. Open Licence 2.0 (etalab-2.0). Date of the form's last update: see the form page.
- Scope of the licence
- Licence stated in the footer of service-public.gouv.fr ("unless otherwise stated, all content of this site is under the etalab-2.0 licence"). It is the licence of the portal that publishes the form; the PDF file, served by formulaires.service-public.gouv.fr, carries no separate licence notice.
- Exclusions
- DILA logos and marks ("Service Public", "Service-Public.fr") are excluded; third-party rights cannot be checked page by page.
Unofficial site. This copy is reproduced under the licence below. Always check the issuing body's website for the latest version.