Landlord: apply for an Anah agreement without works, intermediate rent (cerfa 12807*08)
Original title : Propriétaire bailleur : demander une convention Anah sans travaux (loyer intermédiaire)
- Agency
- Agence nationale de l'habitat (Anah)
- Country
- France
- Form language
- French
- Version
- cerfa 12807*08
- Pages
- 5
- Fields
- 56
Download the fillable PDF · Fill in here
At a glance
Cerfa 12807*08 is the model intermediate-rent agreement between the National Housing Agency (Anah) and a landlord-owner, for a dwelling not receiving a subsidy for works. Five pages: parties, dwelling, duration, letting conditions, maximum rent, obligations, sanctions, tax provisions.
Purpose and who should fill it in
- The landlord-owner who wishes to conclude an intermediate-level rent agreement with Anah completes this document, which reproduces the model agreement in annex I to article D. 321-23 of the construction and housing code (decree no. 2022-465 of 31 March 2022). The PDF specifies that concluding the agreement may, under conditions, allow an income tax reduction.
- The maximum rent per m² is set by regulation at national level, according to the level of market rents in the municipality. The landlord must prove a minimum energy performance level for the dwelling.
- The agreement describes the dwelling (address, living area, area of annexes, so-called tax area, cadastral reference), its start date, its duration in years and its expiry date. Extension is by an amendment; it can be terminated only exceptionally by Anah.
- The landlord undertakes to let unfurnished to individuals, as a main residence occupied at least eight months a year, to tenants whose income does not exceed the ceilings, and at a rent below the ceiling. The letting may not be made to a member of their tax household, an ascendant or a descendant.
- The PDF also recalls monitoring and inspection obligations, sanctions for non-compliance, the jurisdiction of the administrative court in case of dispute and the tax provisions linked to the tax reduction of article 199 tricies of the CGI.
Deadline
This agreement must be concluded before the lease is signed, or before its start date or that of its renewal, or at the latest two months after the signing or start date of the lease or of its renewal; after that period, signing the agreement is no longer possible.
Step by step
- Give your telephone details and e-mail address.
- Give the landlord's identity: name, first name and address, or company name and registered office with the legal representative for a company.
- Give the precise address of the dwelling, the living area, the area of annexes and the so-called tax area, together with the cadastral reference.
- Give the start date, the duration of the agreement in years and the expiry date.
- Read the conditions on occupancy, tenants' income, lease, decency and maximum rent, then give the ceiling rent per m² of tax area, the updated rent and the monthly rent charged excluding service charges.
- Read the monitoring obligations, sanctions and tax provisions.
- Make the agreement in 2 originals: the landlord gives the place and date and signs, then Anah signs in turn.
What the form contains
The PDF has 5 pages. Its entry fields are grouped under 10 headings taken from the document:
- Landlord's contact details — 2 fields: Telephone number ; Email address
- Parties to the agreement — 4 fields: Mr or company: line 1 ; Mr or company: line 2 ; Agency delegate ; President of the Departmental Council
- Landlord, natural person — 4 fields: Landlord's surname and first name ; Residing at ; Landlord's postcode ; Landlord's commune
- Landlord, legal entity — 4 fields: Company name ; Registered office address ; Company's postcode ; Company's commune
- Legal representative — 4 fields: Representative's surname and first name ; Representative's address ; Representative's postcode ; Representative's commune
- Subject: the dwelling — 9 fields: Street number ; Dwelling's street ; Postcode of the dwelling ; Commune of the dwelling
- Dwelling floor areas — 6 fields: B. Floor area: whole m² ; B. Floor area: decimals ; C. Area of annexes: whole m² ; C. Area of annexes: decimals
- Commencement and duration — 7 fields: Effective date: day ; Effective date: month ; Effective date: year ; Duration of the agreement (years)
- Maximum rent and rent charged — 6 fields: Rent ceiling per m²: euros ; Rent ceiling per m²: cents ; Updated rent: euros ; Updated rent: cents
- Made in two originals — 10 fields: Landlord: done at ; Landlord: day ; Landlord: month ; Landlord: year
Filling it in with MaxyForms
This PDF has 56 native entry fields: MaxyForms opens it in your browser, you type your answers into the document, then save or print it.
- Entry areas found, by type: 23 text fields, 31 boxed fields (one character per box) and 2 signature areas.
- Telephone number: 10 printed boxes, one character in each.
- E. Land registry reference: 8 printed boxes, one character in each.
- Landlord's postcode: 5 printed boxes, one character in each.
- 2 signature areas: add your signature with the editor tool, or sign by hand on the printed copy.
- 6 fields can be prefilled from the profile stored on your device (nothing is sent to a server).
Frequently asked questions
- When must the agreement be concluded?
- Before the lease is signed, or before the start date of the lease or its renewal, or at the latest two months after. After that period, signing the agreement is no longer possible.
- When can a dwelling already occupied by a tenant be covered?
- A dwelling occupied by a tenant can be covered by an agreement only on renewal of the lease.
- Within what time must a change be declared to Anah?
- Any change of occupancy or use, any transfer of ownership and any change of the landlord's address must be declared to Anah within two months following the event.
- What must the landlord do on termination?
- They undertake to notify the tenants within fifteen days from the date on which the termination became final.
- Can the PDF be filled in on screen?
- Yes: this PDF contains 64 native fields, which can be filled in the browser with MaxyForms before saving or printing the result.
- Which edition of this form is offered here?
- This page describes edition “cerfa 12807*08”.
What the form does not say
The PDF gives no place of filing and no fees, and refers to the local Anah delegation (www.anah.fr) for further information. See the official page cited in the sources of this sheet. This sheet is general information, not legal advice.
Related forms
Same procedure
- Landlord-owner: commitments to be respected by the new owner (Anah, cerfa 13464*04) Cerfa 13464*04 of the National Housing Agency (Anah) is the undertaking given by the new owner of a dwelling that received a subsidy: it takes over, in place of the beneficiary, the commitments made in return.
- Landlord: financing plan (Anah, cerfa 13461*03) Cerfa 13461*03 of the National Housing Agency (Anah) is the financing plan of a landlord-owner applying for a subsidy: cost of works, loan, personal contribution and expected aid.
- Electoral roll: applying to the judge in case of refusal of registration or removal by the mayor (cerfa 16038*01) Form cerfa 16038*01 of the ministry in charge of the interior: the application by which a voter challenges before the judge of the tribunal judiciaire (including the tribunaux de proximité) the mayor's decision to…
Same issuing body: Agence nationale de l'habitat (Anah)
- My Renovation Advisor: list of territorial offices (cerfa 17100*02)
- Mon Accompagnateur Rénov': certificate of undertaking to follow the supplementary training plan, natural person (Cerfa 17106*01)
- Mon Accompagnateur Rénov': certificate of undertaking to submit the annual activity report, legal entity (Cerfa 17103*01)
- My Renovation Advisor: sworn statement of non-conviction and of situation - Legal entity (cerfa 17107*01)
- Mon Accompagnateur Rénov': certificate of undertaking to submit the annual activity report, natural person (Cerfa 17104*01)
Same topic: Housing
- Prior declaration for constructions and works not subject to a building permit
- Application for a planning certificate (cerfa 13410*13)
- Planning permission application for a single-family house and/or its outbuildings (PCMI)
- Tax on capital gains from sales of social housing: capital gain declaration for a sale for the year 2018 (form 15939*01)
Topics
- Housing and property (86)
- Renovation (24)
- Anah (France) (24)
Official source
- Licence
- Licence Ouverte 2.0 (etalab-2.0)
- Required attribution
- Source: Agence nationale de l'habitat (Anah), via service-public.gouv.fr. Open Licence 2.0 (etalab-2.0). Date of the form's last update: see the form page.
- Scope of the licence
- Licence stated in the footer of service-public.gouv.fr ("unless otherwise stated, all content of this site is under the etalab-2.0 licence"). It is the licence of the portal that publishes the form; the PDF file, served by formulaires.service-public.gouv.fr, carries no separate licence notice.
- Exclusions
- DILA logos and marks ("Service Public", "Service-Public.fr") are excluded; third-party rights cannot be checked page by page.
Unofficial site. This copy is reproduced under the licence below. Always check the issuing body's website for the latest version.