Demolition permit application (executive decree no. 15-19)

Original title : Demande de permis de démolir

Agency
Wilaya (administration locale)
Country
Algeria
Form language
French
Version
Annexe, JORA n° 07 (12/02/2015)
Pages
1
Fields
39

Download the fillable PDF · Fill in here

At a glance

Application form for a demolition permit, published in the Official Journal of the Algerian Republic no. 07 of 12 February 2015 as an annex to executive decree no. 15-19 on the processing and issue of town-planning acts. It identifies the owner, the applicant and the building to be demolished.

Purpose and who should fill it in

  • The one-page form gives the wilaya, daira and commune, then refers to executive decree no. 15-19 of 25 January 2015 setting the procedures for processing and issuing town-planning acts.
  • Items 1 to 5 identify the owner (surname, first name or company name, address, commune, telephone) and then the applicant.
  • Items 6 to 11 describe the land and the building: documents proving ownership or use, address of the building to be demolished, total area of the land, nature of the request, type and use of the building and its size.
  • Item 12 lists other legal or administrative documents and item 13 the proposed time limit for carrying out the demolition work.
  • The form ends with the place, the date and the applicant's signature.

Step by step

  1. Enter the wilaya, the daira and the commune at the top.
  2. Items 1 and 2: surname, first name or company name of the owner, then address (number and street), commune and telephone.
  3. Items 3 to 5: surname and first name or company name of the applicant, their address, commune and telephone.
  4. Item 6: describe the type of documents proving ownership or use.
  5. Items 7 and 8: address of the building to be demolished and total area of the land.
  6. Items 9 to 11: nature of the request, type and use of the building to be demolished, then its size.
  7. Item 12: list the other legal or administrative documents; item 13: propose the time limit for carrying out the demolition work.
  8. Finish with the place, the date and the applicant's signature.

What the form contains

The PDF has 1 page. Its entry fields are grouped under 5 headings taken from the document:

  • Wilaya (province), daïra (district), commune (town or city) — 3 fields: Wilaya (province) ; Daïra (district) ; Commune
  • Owner (landlord) — 7 fields: Owner's name or company name ; Owner's name or company name (continued 1) ; Owner's name or company name (continued 2) ; Owner's address (landlord) (number and street)
  • Applicant — 6 fields: Applicant's name or company name ; Applicant's name or company name (continued) ; Applicant's address (number and street) ; Applicant's address (number and street) (continued)
  • Land and project — 20 fields: Title deeds or evidence of use ; Title deeds or evidence of use (continued 1) ; Title deeds or evidence of use (continued 2) ; Address of the building to be demolished
  • Place and date — 3 fields: Done at ; Done on (date) ; Applicant's signature

Filling it in with MaxyForms

This PDF has no built-in entry fields: MaxyForms places 39 entry areas over the printed spaces, then you save or print the completed document.

  • Entry areas found, by type: 37 text fields, 1 date and 1 signature area.
  • Dates: the editor expects the format JJ/MM/AAAA.
  • 1 signature area: add your signature with the editor tool, or sign by hand on the printed copy.
  • 8 fields can be prefilled from the profile stored on your device (nothing is sent to a server).

Frequently asked questions

What must be proposed for the works?
Item 13 asks for the proposed time limit for carrying out the demolition work.
Which building is described?
Item 7 gives its address, item 10 the type and use and item 11 the size of the building to be demolished.
Which reference text is cited?
The title of the form cites executive decree no. 15-19 of 25 January 2015, setting the procedures for processing and issuing town-planning acts.
Which edition of this form is offered here?
This page describes edition “Annexe, JORA n° 07 (12/02/2015)”.

What the form does not say

The form does not specify the documents to attach, the place of filing, the processing time or the fees: see the decree cited and the local authority concerned. This sheet is general information, not legal advice.

Legal framework

The form cites: “décret exécutif n° 15-19 du 25 janvier 2015”. Official pages consulted: Algerian Official Journal no. 7 (12 February 2015), published on joradp.dz, contains this text under the title “Décret exécutif n° 15-19 du 4 Rabie Ethani 1436 correspondant au 25 janvier 2015 fixant les modalités d’instruction et de délivrance des actes d’urbanisme” (title in French). This section points to those pages and does not comment on the texts.

This summary reports what the cited official texts say. It is not legal advice and does not tell you whether you must file this form.

Related forms

Same procedure

Same issuing body: Wilaya (administration locale)

Same topic: Housing

Official source

Wilaya (administration locale)

Required attribution
Source: Wilaya (administration locale).

Unofficial site. This copy is reproduced under the licence below. Always check the issuing body's website for the latest version.

Report a problem or request removal