Application for a land subdivision certificate (executive decree no. 15-19)

Original title : Demande de certificat de morcellement

Agency
Wilaya (administration locale)
Country
Algeria
Form language
French
Version
Décret exécutif n° 15-19 (JORA n° 07 du 12/02/2015)
Pages
1
Fields
39

Download the fillable PDF · Fill in here

At a glance

Application form for a land subdivision certificate, published in the Official Journal of the Algerian Republic no. 07 of 12 February 2015 as an annex to executive decree no. 15-19 on the processing and issue of town-planning acts. It identifies the owner, the applicant, the plot and the resulting lots.

Purpose and who should fill it in

  • The one-page form opens with the wilaya, daira and commune concerned, then refers to executive decree no. 15-19 of 25 January 2015, which sets the procedures for processing and issuing town-planning acts.
  • Items 1 to 5 identify the owner (surname, first name or company name, address, commune, telephone) and then the applicant, who may be another person.
  • Items 6 to 9 concern the land: type of documents proving ownership or use, address of the plot to be subdivided, total area and number of resulting lots with their areas.
  • Items 10 to 13 describe the current use of the land and buildings, the future use of the lots, and the footprint and size of existing buildings and of projects.
  • Item 14 lists other legal or administrative documents, before the place, date and signature of the applicant.

Step by step

  1. Enter the wilaya, the daira and the commune at the top.
  2. Items 1 and 2: surname, first name or company name of the owner, then their address (number and street), commune and telephone.
  3. Items 3 to 5: surname and first name or company name of the applicant, their address, commune and telephone.
  4. Item 6: describe the type of documents proving ownership or use.
  5. Items 7 to 9: address of the plot to be subdivided, total area of the land, number of resulting lots and their areas.
  6. Items 10 to 13: current use, future use of the lots, footprint and size of existing buildings, then of projects on the resulting lots.
  7. Item 14: list the other legal or administrative documents.
  8. Finish with the place, the date and the applicant's signature.

What the form contains

The PDF has 1 page. Its entry fields are grouped under 7 headings taken from the document:

  • Wilaya (province), daïra (district) and commune (town or city) — 3 fields: Wilaya (province) ; Daïra (district) ; Commune
  • 1 and 2 - Owner — 7 fields: Owner: surname, first name or company name ; Owner: name (continued) ; Owner: name (line 3) ; Owner: address (number and street)
  • 3 to 5 - Applicant — 6 fields: Applicant: surname, first name or company name ; Applicant: name (continued) ; Applicant: address (number and street) ; Applicant: address (continued)
  • 6 to 9 - Titles, plot and lots — 8 fields: Type of titles proving ownership ; Titles: continued ; Titles: line 3 ; Address of the plot to be divided
  • 10 to 13 - Use, footprint and building envelope — 8 fields: Current use of the land and buildings ; Current use: continued ; Future use of the resulting lots ; Future use: continued
  • 14 - Other documents — 4 fields: Other legal documents ; Other documents: line 2 ; Other documents: line 3 ; Other documents: line 4
  • Place, date and signature — 3 fields: Done at ; Done at, on ; Applicant's signature

Filling it in with MaxyForms

This PDF has no built-in entry fields: MaxyForms places 39 entry areas over the printed spaces, then you save or print the completed document.

  • Entry areas found, by type: 37 text fields, 1 date and 1 signature area.
  • Dates: the editor expects the format JJ/MM/AAAA.
  • 1 signature area: add your signature with the editor tool, or sign by hand on the printed copy.
  • 4 fields can be prefilled from the profile stored on your device (nothing is sent to a server).

Frequently asked questions

Must the applicant be the owner?
The form provides for two separate identities, the owner (items 1 and 2) and the applicant (items 3 to 5), without requiring that they be different.
What information is given about the lots?
The number of resulting lots and their areas (item 9), their future use (item 11) and the footprint and size of the projects planned on each (item 13).
Where can the regulatory framework be found?
The title of the form cites executive decree no. 15-19 of 25 January 2015, setting the procedures for processing and issuing town-planning acts.
Which edition of this form is offered here?
This page describes edition “Décret exécutif n° 15-19 (JORA n° 07 du 12/02/2015)”.

What the form does not say

The form does not specify the documents to attach, the place of filing, the time limit or the fees: see the decree cited and the local authority concerned. This sheet is general information, not legal advice.

Legal framework

The form cites: “décret exécutif n° 15-19 du 25 janvier 2015”. Official pages consulted: Algerian Official Journal no. 7 (12 February 2015), published on joradp.dz, contains this text under the title “Décret exécutif n° 15-19 du 4 Rabie Ethani 1436 correspondant au 25 janvier 2015 fixant les modalités d’instruction et de délivrance des actes d’urbanisme” (title in French). This section points to those pages and does not comment on the texts.

This summary reports what the cited official texts say. It is not legal advice and does not tell you whether you must file this form.

Related forms

Same procedure

Same issuing body: Wilaya (administration locale)

Same topic: Housing

Official source

Wilaya (administration locale)

Required attribution
Source: Wilaya (administration locale).

Unofficial site. This copy is reproduced under the licence below. Always check the issuing body's website for the latest version.

Report a problem or request removal