Prior declaration for any building or civil engineering operation above 500 man-days (form 13630*02)

Agency
Ministère chargé du travail
Country
France
Form language
French
Version
13630*02
Pages
1
Fields
96

Download the fillable PDF · Fill in here

At a glance

Prior declaration for a building or civil engineering operation, form no. 13630*02 of the ministry in charge of labour, based on articles L4532-1, R. 4532-2 and R. 4532-3 of the labour code. One page completed by the project owner to describe the site and those involved.

Purpose and who should fill it in

  • The text states which operations are concerned: those whose expected workforce must exceed twenty workers at any time during the works and whose duration must exceed thirty working days, as well as those whose planned volume exceeds 500 man-days.
  • The declaration is sent by the applicant no later than the date the building permit is filed.
  • It collects the project owner's contact details, the precise description of the operation (nature, type of work, address, forecast dates and duration, workforce, number of lots) and the identity of the contract holders.
  • A box gives the date on which it was sent to three bodies: the regional labour, employment and vocational training directorate, the regional health insurance fund (or general social security fund) and the regional committee of the OPPBTP.

Where to submit it

The form provides a communication date: the declaration is sent to the regional labour, employment and vocational training directorate, to the regional health insurance fund (or general social security fund) and to the regional committee of the OPPBTP.

Deadline

The text states that the declaration is sent by the applicant no later than the date the building permit is filed.

Step by step

  1. Date of communication: enter the date on which the declaration was sent to the bodies named.
  2. Project owner's contact details: name, address, postcode, town, telephone, fax, e-mail.
  3. Precise description of the operation: nature, then type of site (housing, detached houses, roads and utilities, networks, offices, civil engineering works, rehabilitation, industrial buildings, linear sites, demolition).
  4. Address of the operation, forecast start date, forecast duration of works, forecast workforce, total duration if different and number of lots.
  5. Contract holders: design project manager and execution project manager if different, with contact details.
  6. Health and safety coordinators: legal entity, design coordinator and execution coordinator (individuals).
  7. Companies already appointed: name, address, lot number, speciality and forecast workforce, or the box "no company appointed to date".

What the form contains

The PDF has 1 page. Its entry fields are grouped under 10 headings taken from the document:

  • Date of communication — 3 fields: Date of communication: day ; Date of communication: month ; Date of communication: year
  • Client's contact details — 10 fields: Project owner: name ; Client (project owner): street number ; Project owner: street ; Project owner: postcode
  • Precise description of the operation — 12 fields: Nature of the transaction ; Nature of the transaction (continued) ; Dwellings ; Offices
  • Address of the operation — 6 fields: Operation: street number ; Operation: street ; Operation: postcode ; Operation: PO box
  • Timetable and staff numbers — 7 fields: Planned start: day ; Planned start: month ; Planned start: year ; Forecast duration of the works
  • Project manager (design) — 10 fields: Project manager (design): surname ; Project manager (design): street number ; Project manager (design): street ; Project manager (design): postcode
  • Project manager (execution) — 10 fields: Project manager (execution): surname ; Project manager (execution): street number ; Project manager (execution): street ; Project manager (execution): postcode
  • Health and safety coordinator: legal entity — 10 fields: Health and safety coordinator (legal entity): name ; Health and safety coordinator (legal entity): street number ; Health and safety coordinator (legal entity): street ; Health and safety coordinator (legal entity): postcode
  • Health and safety coordinator: individual — 2 fields: Design-stage health and safety coordinator: name ; Construction-stage health and safety coordinator: name
  • Companies already appointed — 26 fields: Company 1: name ; Company 1: address ; Company 1: lot no. ; Company 1: specialism

Filling it in with MaxyForms

This PDF has 96 native entry fields: MaxyForms opens it in your browser, you type your answers into the document, then save or print it.

  • Entry areas found, by type: 69 text fields, 1 long-text area, 15 boxed fields (one character per box) and 11 checkboxes.
  • Project owner: postcode: 5 printed boxes, one character in each.
  • Operation: postcode: 5 printed boxes, one character in each.
  • Project manager (design): postcode: 5 printed boxes, one character in each.
  • 4 fields can be prefilled from the profile stored on your device (nothing is sent to a server).

Frequently asked questions

Can the form be filled in on screen?
At the time of writing, this PDF contains only one native input field: most sections are completed after printing, or with MaxyForms tools for writing onto the page.
Who must complete this declaration?
The text says it is sent by the applicant, and the identity section is that of the project owner.
Is a small site concerned?
The form covers operations exceeding twenty workers, lasting more than thirty working days, or above 500 man-days, as the heading recalls.
Where can I find the official version of the form?
On the service-public page given in the sources of this page, which states a last check on 29 March 2021.
Which edition of this form is offered here?
This page describes edition “13630*02”. It was taken from entreprendre.service-public.gouv.fr on 29 October 2026. The official page showed an update on 29 March 2021.

Official links

Official pages related to this form, with the date each link was last checked.

  • Official form www.formulaires.service-public.gouv.fr · checked on 12 November 2026

Edition, source and dates

Edition
13630*02
Official reference
cerfa 13630-02
Taken from the source on
29 October 2026
Official page updated on
29 March 2021

Related forms

Same procedure

Same issuing body: Ministère chargé du travail

Same topic: Work and employment

Topics

Official source

entreprendre.service-public.gouv.fr

Licence
Licence Ouverte 2.0 (etalab-2.0)
Required attribution
Source: Ministère chargé du travail, via service-public.gouv.fr. Open Licence 2.0 (etalab-2.0). Date of the form's last update: see the form page.
Scope of the licence
Licence stated in the footer of service-public.gouv.fr ("unless otherwise stated, all content of this site is under the etalab-2.0 licence"). It is the licence of the portal that publishes the form; the PDF file, served by formulaires.service-public.gouv.fr, carries no separate licence notice.
Exclusions
DILA logos and marks ("Service Public", "Service-Public.fr") are excluded; third-party rights cannot be checked page by page.

Unofficial site. This copy is reproduced under the licence below. Always check the issuing body's website for the latest version.

Report a problem or request removal